Highway 1 – 264th Street Interchange Project
Project Description
The Project includes the following elements:
• Upgrading the existing 264th Street interchange to accommodate increased traffic volumes and highway widening. The structures and ramps will be designed to current standards to improve safety and reliability.
• Highway 1 widening to include:
– an HOV / EV lane in each direction, from approximately 1.6km west of 264th Street to 3.7km east; and
– bus-on-shoulder lane in each direction, for approximately 3.7km east of 264th Street.
• Active transportation infrastructure improvements, including:
– a multi-use path (MUP) along the north side of Highway 1 from the 264th Street interchange to approximately 3.7km east; and
– improved active transportation connections at the 264th Street interchange.
• A new transit exchange at the 264th Street interchange, including a bus loop and vehicle parking with approximately 180-200 stalls.
• A new truck parking lot at the 264th Street interchange with approximately 25 stalls.
Client: | Ministry of Transportation and Infrastructure |
Project Cost: | Please see Ministry of Transportation and Infrastructure Project Website (identified below) |
Partner: | TBD |
Project Status: | In procurement |
Project Website: | https://www2.gov.bc.ca/gov/content/transportation-projects/fraser-valley-highway1/264tohighway11 |
Milestones
Request for Qualifications Issued | August 8, 2023 |
Request for Qualifications Closed | October 5, 2023 |
Request for Proposal Issued | December 20, 2023 |
Request for Proposal Closed | June 18, 2024 |
Contract Award | TBD |
Project Completion | 2028 (anticipated) |