Eric Hamber Secondary School Replacement Project

Project Description

The new school, which has capacity for 1,700 students, was built to LEED gold standards that include energy-saving measures to reduce greenhouse-gas emissions. Eric Hamber is the first secondary school in Vancouver to feature a dedicated child care centre for children under age five. The rooftop child care facility has nearly 70 licensed spaces for children.

The school integrates Indigenous designs, including a five-metre (16 foot) female welcome figure and weaving creations inspired by xʷməθkʷəy̓əm (Musqueam) artists, Brent Sparrow and Debra Sparrow. This reflects the Vancouver School Board’s commitment to reconciliation and to honour the rich cultural traditions and history of the xʷməθkʷəy̓əm (Musqueam) people.

The Project was procured using a design-build approach.

Project Status:

Completed September 2024

Client:

Vancouver Board of Education of School District No. 39 – Vancouver

Project Cost:

$92 million (Approximately)

Partner:

Bird Design-Build Construction Inc.

Project Milestones

Request for Qualifications Issued
January 8, 2019
Request for Qualifications Closed
March 5, 2019
Shortlist Announced
July 31, 2019
Request for Proposals Issued
July 31, 2019
Contract Award
April 30, 2020
Construction Began
Early 2021
Construction Completed
September 2024

Project Contacts

Please refer to the ‘Contact Information’ section of the VSB EH webpage.

Project Location

Other

Completed

Projects