Project Description
The Fraser River Tunnel Project includes a new, eight-lane immersed tube tunnel that will replace the existing George Massey Tunnel on Highway 99. The new tunnel will have three vehicle lanes and a dedicated transit lane in each direction, with a separated active transportation corridor for cyclists and pedestrians.
The project will be delivered through a collaborative Progressive Design-Build with Target Price model that will ensure early contractor involvement through a Design Early Works Agreement (DEWA) and effective and manageable risk allocation in the final Design-Build Agreement (DBA).
Client: | Ministry of Transportation and Infrastructure |
Project Delivered by: | Transportation Investment Corporation |
Project Cost: | $4.15 billion |
Partner: | TBD |
Project Status: | In procurement |
Project Website: | https://www.highway99tunnel.ca/project-overview-frt/ |
Project Image: | click to download |
Milestones
Request for Qualifications Issued | June 14, 2023 |
Request for Qualifications Closed | September 14, 2023 |
DEWA RFP Issued | October 26, 2023 |
DEWA RFP Closed | April 4, 2024 |
DBA RFP Issued | Spring 2024 (anticipated) |
DBA RFP Closed | 2025 (anticipated) |
Contract Award | 2025 (anticipated) |
Tunnel Construction to Begin | 2026 (anticipated) |
Tunnel Construction Completed | 2030 (anticipated) |
Project Completion | 2032 (anticipated) |