Highway 1 – 264th Street Interchange Project

Project Description

The Project includes the following elements:
• Upgrading the existing 264th Street interchange to accommodate increased traffic volumes and highway widening. The structures and ramps will be designed to current standards to improve safety and reliability.
• Highway 1 widening to include:
– an HOV / EV lane in each direction, from approximately 1.6km west of 264th Street to 3.7km east; and
– bus-on-shoulder lane in each direction, for approximately 3.7km east of 264th Street.
• Active transportation infrastructure improvements, including:
– a multi-use path (MUP) along the north side of Highway 1 from the 264th Street interchange to approximately 3.7km east; and
– improved active transportation connections at the 264th Street interchange.
• A new transit exchange at the 264th Street interchange, including a bus loop and vehicle parking with approximately 180-200 stalls.
• A new truck parking lot at the 264th Street interchange with approximately 25 stalls.

Client:Ministry of Transportation and Infrastructure
Project Cost:Please see Ministry of Transportation and Infrastructure Project Website (identified below)
Partner:KEA Fraser Valley Connectors –  a partnership between Kiewit Infrastructure BC ULC and Emil Anderson Construction (EAC) Inc.
Project Status:Under Construction
Project Website:https://www2.gov.bc.ca/gov/content/transportation-projects/fraser-valley-highway1/264tohighway11

Milestones

Request for Qualifications IssuedAugust 8, 2023
Request for Qualifications ClosedOctober 5, 2023
Request for Proposal IssuedDecember 20, 2023
Request for Proposal ClosedJune 18, 2024
Contract Award July 24, 2024
Project Completion2028 (anticipated)

Project Updates

Procurement Documents

Project Map

Project Contacts

Dawn Wilson
Project Director
dawn.wilson@infrastructurebc.com

Back To Top