Pattullo Bridge Replacement Project
The Pattullo Bridge is a key connection between the communities of Surrey and New Westminster. The new four-lane Pattullo Bridge will provide important improvements for everyone using the bridge, including people who are driving, cycling or walking, as well as communities on either side of the bridge.
Pattullo Bridge Replacement Project
Project Details
Project Description: The Pattullo Bridge is a key connection between the communities of Surrey and New Westminster. The new four-lane Pattullo Bridge will provide important improvements for everyone using the bridge, including people who are driving, cycling or walking, as well as communities on either side of the bridge, including:
- A safer crossing for all bridge users with modern, wider lanes, separated by a centre median barrier
- Dedicated walking and cycling lanes, separated from traffic by a barrier on both sides of the bridge
- Better connections to, from and near the bridge
The new bridge is scheduled to open in 2023. Once the new bridge is open, the existing bridge will be removed.
Client: | Ministry of Transportation and Infrastructure |
Project delivered by: | Transporation and Investment Corporation |
Project Cost: | $1.377 billion |
Partner: | Fraser Crossing Project Corporation |
Project Status: | Under construction |
Project Report: | Click to download |
Project Website: | engage.gov.bc.ca/pattullobridge |
Project Image: | Click to download |
Milestones
Request for Qualifications issued | July 16, 2018 |
Request for Qualifications closed | September 2018 |
Shortlist announced | February 14, 2019 |
Request for Proposals issued | February 14, 2019 |
Contract award | February 7, 2020 |
Construction to begin | 2020 |
Construction completed |
Project Updates
- Pattullo Bridge replacement will mean safer, easier, toll-free commutes (February 10, 2020)
- Pattullo Bridge Replacement Project moves forward (February 14, 2019)
- One step closer to a safer crossing: Pattullo Bridge procurement begins (July 16, 2018)
- Pattullo Bridge replacement will improve safety and create good jobs (February 16, 2018)
Procurement documents
- Project Agreement Redacted (February 7, 2020)
- Schedule 1 Definitions and Interpretation
- Schedule 2 Representatives, Review Procedure and Consent Procedure
- Schedule 3 Project Schedule
- Schedule 4 Design and Construction
- Schedule 5 Project Work Defects and Warranties
- Schedule 6 Environmental Obligations
- Schedule 7 Quality Management
- Schedule 8 Lands
- Schedule 9 Communications and Engagement
- Schedule 10 Payment and Performance Mechanism
- Schedule 11 Changes
- Schedule 12 Proposal Extracts
- Schedule 13 Compensation on Termination
- Schedule 14 Lenders’ Remedies Agreement
- Schedule 15 Insurance Requirements
- Schedule 16 Dispute Resolution Procedure
- Schedule 17 Records and Reports
- Schedule 18 Insurance Trust Agreement
- Schedule 19 Collateral Agreement
- Schedule 20 Waiver of Moral Rights
- Schedule 21 Community Benefits Requirements
- Schedule 22 Indigenous Requirements
- Schedule 23 Privacy Protection
- Schedule 24 Closing Deliveries
- Schedule 25 Financing and Shareholder Agreements
- Schedule 26 Interface Requirements
- Document Library
- Final Report of the Fairness Advisor (December 12, 2019)
- Request for Proposals (February 14, 2019)
- Report of the Fairness Advisor (November 1, 2018)
- Request for Qualifications (July 16, 2018)