Surrey Langley SkyTrain Project (SLS Project) – Systems and Trackwork Contract
The Surrey Langley SkyTrain Project (SLS Project) is a 16-km elevated extension of the existing Expo Line primarily along Fraser Highway from the current terminus at King George Station in the City of Surrey, through the Township of Langley to a new terminus station at 203 St. in Langley City Centre.
Surrey Langley SkyTrain Project (SLS Project) – Systems and Trackwork Contract
Project Details
Project Description: The Surrey Langley SkyTrain Project (SLS Project) is a 16-km elevated extension of the existing Expo Line primarily along Fraser Highway from the current terminus at King George Station in the City of Surrey, through the Township of Langley to a new terminus station at 203 St. in Langley City Centre. The Project includes eight new stations, three new transit exchanges, and nine new propulsion power substations.
The SLS Project consists of the following separately procured and staggered contracts:
- Guideway Contract – including substructures, superstructures, roadworks, and utilities, procured under a Design-Build-Finance (DBF) model.
- Stations Contract – including eight passenger stations, nine propulsion power substations, and 250m of guideway construction at the terminus station, procured under a Design-Build (DB) model.
- Systems and Trackwork Contract – including trackwork, power rail and linear induction motor (LIM) rail system, communications, automated train control, and power propulsion equipment, procured under a Target Price model.
Client: | Ministry of Transportation and Infrastructure |
Project delivered by: | Transportation Investment Corporation |
Project Cost: | The total cost of the Surrey Langley SkyTrain is $5.996 billion. |
Project Status: | The Systems and Trackwork Contract is in procurement. |
Website: | www2.gov.bc.ca/gov/content/transportation-projects/surrey-langley-skytrain |
Images: | – SLS Project Alignment Map – 166th St Station conceptual rendering |
Systems and Trackwork Contract Milestones
Request for Qualifications issue | November 14, 2022 |
Request for Qualifications close | January 23, 2023 |
Announce shortlisted respondents | April 25, 2023 |
Request for Proposals issue | April 25, 2023 |
Request for Proposals close | January 12, 2024 |
Contract award | 2024(anticipated) |
Construction to begin | 2024 (anticipated) |
Construction completed | 2029 (anticipated) |
Project Updates
- Eight new station names announced for Surrey Langley SkyTrain
- Surrey Langley SkyTrain Systems, Trackwork Contract Business-to-Business Networking Event
- Firms shortlisted for Surrey Langley SkyTrain systems, trackwork contract
- Surrey Langley SkyTrain takes another step
- Third request for qualifications issued for Surrey Langley SkyTrain
- Second procurement launched for Surrey Langley SkyTrain
- Province launches first procurement for Surrey Langley SkyTrain
Procurement Documents
- Surrey Langley SkyTrain – Systems and Trackwork RFP Volume 1 Instructions to Proponents
- Surrey Langley Skytrain Systems and Trackwork RFQ Report of the Fairness Reviewer
- Surrey Langley Skytrain Project – Systems and Trackwork-RFQ-2022-CONFORMED
Project Map
Project Contacts
Jordan Royer, Senior Associate
Email: jordan.royer@infrastructurebc.com